PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Finished installing metal decking at Derricks 4-6 (4th Floor) Facing South-West  (800x600).jpg Started laying out gravel for the slab on grade at the Servery Room 105 Facing North-East   (800x600).jpg Material for Stairs -2 Facing South (800x600).jpg Started installing the trench drains at Rooms 141,142,145 Facing West (800x600).jpg
Previous pageNext page Started laying out gravel for the slab on grade at the Servery Room 105 Facing North-East   (800x600)
Started laying out gravel for the slab on grade at the Servery Room 105 Facing North-East (800x600)